Formwork, Reinforcement, and Pouring (FRP) works for the construction of 11 bridges.
Projects
Majura Parkway Bridge No. 3 and Associated Works
Construction of twin bridges over Fairbairn Avenue, including abutments, wing walls, cross beams, deck, and concrete barriers.
Gee Gee Bridge (Bridge over Wakool River)
Construction of abutments, 12 elevated headstocks, concrete decks, and traffic barriers.
Barton Highway Roundabout Bridges
Construct a new cyclist bridge and upgrade the existing bridge.
Cotter Road Stage 2 Duplication and Shared Path Works
Construction of two single-span Super Tee girder bridges.
Googong Estate Bebo Arch Bridge
Construction of a Bebo Arch bridge over water with stringent environmental controls.
Dugald River Mine Tailings Dam Plinth and Structures
Construction of 245m of concrete reinforced plinth ranging from flat surfaces up to a 53% grade.
Rocklands Copper Mine, QLD
Earthworks, detailed excavation, concrete footings, foundations, and slabs for processing equipment.
Dalby Dryer
Supply and place 620m³ of concrete and supply and tie 78 tonnes of reinforcement…
Paradise Dam Spillway Upgrade – Stage 2
Construct 7 x 45m long infill steps and 2 x 45m tie-in steps to name a few
Paradise Dam Spillway Upgrade – Stage 1
Placement of 125 tonnes of steel reinforcement and installation of 172 meters of water stop
Fairbairn Dam Spillway Upgrade
Anchor and thicken existing spillway to comply with new legislation
Recent News
We at Nathan Contractors are excited to announce the celebration of...
As Australia transitions towards a more sustainable energy future,...
Nathan Contractors is making a significant impact across Australia...
Nathan Contractors has built a reputation for excellence across a...