Clarke Creek Substation

Client

ACCIONA / Yurika

Location

Rockhampton, QLD

Scope

Civil works for three substations at the Clarke Creek Wind Farm project.
☛ Earthworks
☛ Formwork
☛ Reinforcing steel
☛ Concrete works
☛ Conduits
☛ Drainage
☛ Stormwater installation
☛ Supported infrastructure for 100 4.5MW wind turbines across three substations (North, Central, and South).

Key Successes and Achievements

Nathan Contractors was engaged by ACCIONA / Yurika to complete the civil works for three substations (North, Central, and South) at the Clarke Creek Wind Farm project in Rockhampton, QLD. The project involved extensive earthworks, formwork, steel reinforcement, concrete works, and installation of conduits and drainage systems. Despite facing challenging weather conditions and logistical hurdles, Nathan Contractors delivered high-quality work, ensuring safety and client satisfaction. The project scope was significantly expanded due to the exemplary performance, reinforcing Nathan Contractors' capability and reliability in executing large-scale energy projects.
☛ Quality and Safety: Maintained a high standard of workmanship and safety, meeting client specifications despite challenges such as wet weather, extreme heat, and concrete delivery issues. Achieved zero lost time injuries (LTIs).
☛ Project Expansion: Scope of works was extended by 300% due to Nathan Contractors' quality workmanship and ability to exceed customer expectations.
☛ Community Engagement: Worked respectfully on the land of the Barada Kabalbara Yetimarala (BKY) peoples, ensuring minimal impact and fostering positive relationships with local communities.
☛ Environmental Impact: Contributed to the project's goal of generating 450MW of electricity, sufficient to power approximately 330,000 Queensland homes, reducing annual carbon emissions by 738,000 tonnes.
☛ 1,700m³ of concrete poured
☛ 260 tonnes of steel installed
☛ 40,000 labor hours

Client

ACCIONA / Yurika

Location

Rockhampton, QLD

Contract Value

Project Duration

21 months

Scope

Civil works for three substations at the Clarke Creek Wind Farm project.
☛ Formwork
☛ Reinforcing steel
☛ Concrete works
☛ Conduits
☛ Drainage
☛ Stormwater installation
☛ Supported infrastructure for 100 4.5MW wind turbines across three substations (North, Central, and South).

Key Successes and Achievements

Nathan Contractors was engaged by ACCIONA / Yurika to complete the civil works for three substations (North, Central, and South) at the Clarke Creek Wind Farm project in Rockhampton, QLD. The project involved extensive earthworks, formwork, steel reinforcement, concrete works, and installation of conduits and drainage systems. Despite facing challenging weather conditions and logistical hurdles, Nathan Contractors delivered high-quality work, ensuring safety and client satisfaction. The project scope was significantly expanded due to the exemplary performance, reinforcing Nathan Contractors' capability and reliability in executing large-scale energy projects.
☛ Quality and Safety: Maintained a high standard of workmanship and safety, meeting client specifications despite challenges such as wet weather, extreme heat, and concrete delivery issues. Achieved zero lost time injuries (LTIs).
☛ Project Expansion: Scope of works was extended by 300% due to Nathan Contractors' quality workmanship and ability to exceed customer expectations.
☛ Community Engagement: Worked respectfully on the land of the Barada Kabalbara Yetimarala (BKY) peoples, ensuring minimal impact and fostering positive relationships with local communities.
☛ Environmental Impact: Contributed to the project's goal of generating 450MW of electricity, sufficient to power approximately 330,000 Queensland homes, reducing annual carbon emissions by 738,000 tonnes.
☛ 1,700m³ of concrete poured
☛ 260 tonnes of steel installed
☛ 40,000 labor hours