Gee Gee Bridge (Bridge over Wakool River)
Client
Nelmac Pty Ltd
Location
Wetuppa, NSW
Scope
☛ Construction of abutments, 12 elevated headstocks, concrete decks, and traffic barriers.
☛ Utilization of 475m³ of concrete, 105 tonnes of reinforcing steel, and 1,600m² of formwork.
Key Successes and Achievements
☛ Project completed within the 6-month schedule and under budget.
☛ Zero lost time injuries.
☛ High quality of workmanship maintained throughout, resulting in a superior final product.
☛ Developed a strong, trust-based relationship with Nelmac Pty Ltd, leading to project success.
☛ Gained valuable experience in bridge construction over water and managing elevated structures in remote locations.
Client
Nelmac Pty Ltd
Location
Wetuppa, NSW
Contract Value
$1,000,000
Project Duration
6 months
Scope
☛ Utilization of 475m³ of concrete, 105 tonnes of reinforcing steel, and 1,600m² of formwork.
Key Successes and Achievements
☛ Project completed within the 6-month schedule and under budget.
☛ Zero lost time injuries.
☛ High quality of workmanship maintained throughout, resulting in a superior final product.
☛ Developed a strong, trust-based relationship with Nelmac Pty Ltd, leading to project success.
☛ Gained valuable experience in bridge construction over water and managing elevated structures in remote locations.



