Gee Gee Bridge (Bridge over Wakool River)

Client

Nelmac Pty Ltd

Location

Wetuppa, NSW

Scope

☛ Construction of abutments, 12 elevated headstocks, concrete decks, and traffic barriers.
☛ Utilization of 475m³ of concrete, 105 tonnes of reinforcing steel, and 1,600m² of formwork.

Key Successes and Achievements

☛ Project completed within the 6-month schedule and under budget.
☛ Zero lost time injuries.
☛ High quality of workmanship maintained throughout, resulting in a superior final product.
☛ Developed a strong, trust-based relationship with Nelmac Pty Ltd, leading to project success.
☛ Gained valuable experience in bridge construction over water and managing elevated structures in remote locations.

Client

Nelmac Pty Ltd

Location

Wetuppa, NSW

Contract Value

$1,000,000

Project Duration

6 months

Scope

☛ Utilization of 475m³ of concrete, 105 tonnes of reinforcing steel, and 1,600m² of formwork.

Key Successes and Achievements

☛ Project completed within the 6-month schedule and under budget.
☛ Zero lost time injuries.
☛ High quality of workmanship maintained throughout, resulting in a superior final product.
☛ Developed a strong, trust-based relationship with Nelmac Pty Ltd, leading to project success.
☛ Gained valuable experience in bridge construction over water and managing elevated structures in remote locations.